The withstand voltage test standard for vacuum pressure switches

Vacuum Pressure Switch Withstand Voltage Testing Standards

International Compliance Frameworks for High-Voltage Testing

IEC 60529 and GB/T 11022 Requirements

Vacuum pressure switches must adhere to IEC 60529 (Ingress Protection) and GB/T 11022 (High-Voltage Switchgear Standards) for withstand voltage testing. These standards define critical parameters such as:

  • Test Voltage Levels: For a 12 kV-rated switch, the main circuit requires a 30 kV AC voltage for 60 seconds, while auxiliary circuits are tested at 2 kV AC for the same duration. For 35 kV systems, disconnection switches must endure 118 kV AC for 1 minute during disconnection tests and 185 kV impulse voltage for overall system integrity.

  • Environmental Controls: Tests must occur at temperatures between -25°C and 40°C and relative humidity ≤85% to prevent condensation or insulation degradation. A 2025 study revealed that 43% of test failures stem from uncontrolled humidity during calibration.

  • Safety Protocols: Operators must wear insulated gloves and boots, and testing areas must be cordoned off with 3-meter safety zones. Equipment must include automatic voltage cutoffs to prevent over-testing.

Industry-Specific Modifications for Critical Applications

  • Power Distribution: Switches in 35 kV grids require 95 kV AC tests for 1 minute to simulate lightning surges, with voltage rise rates limited to 1 kV/s to avoid transient errors.

  • Semiconductor Manufacturing: Cleanroom switches undergo particle-free calibration using HEPA-filtered workstations to meet ISO Class 5 standards (≤3,520 particles/m³ ≥0.5 μm).

  • Chemical Processing: Devices exposed to corrosive gases must pass salt-fog tests (IEC 60068-2-11) and use PTFE-coated diaphragms to resist sulfur compounds.

Test Equipment and Pre-Test Procedures

Selection and Calibration of Testing Devices

  • High-Voltage Generators: Must deliver 50 Hz AC voltage with stability ≤0.02% FS over 2 minutes. For 35 kV systems, generators must support 185 kV impulse voltage with 1.2/50 μs waveforms to replicate lightning strikes.

  • Measurement Instruments: Use 2500V megohmmeters for insulation resistance tests (≥1000 MΩ) and 0.01%-accuracy multimeters for leakage current measurements (≤5 mA).

  • Environmental Simulation: Temperature chambers must maintain -40°C to 85°C ranges for thermal shock testing, while humidity controllers regulate ≤85% RH to prevent tracking errors.

Pre-Test Inspection and Setup

  1. Visual Inspection: Check for cracks, corrosion, or loose connections. A 2023 industry report found that 15% of switches fail due to undetected physical damage.

  2. Electrical Checks: Verify insulation resistance between terminals and housing (≥20 MΩ per GB/T 11022) and ensure no residual charge remains from prior operations.

  3. Test Wiring: Connect high-voltage leads to the switch’s static contact terminal and ground the housing. Use shielded cables to minimize electromagnetic interference during measurements.

Test Execution and Data Analysis

Step-by-Step Testing Protocol

  1. Voltage Ramp-Up: Increase voltage from zero to target at ≤1 kV/s to avoid transient overvoltages. For a 12 kV switch, this means reaching 30 kV in 30 seconds.

  2. Sustained Testing: Maintain target voltage for 60 seconds, monitoring for flashovers, arcing, or audible discharges. A 2024 case study showed that 82% of failures occur within the first 20 seconds of sustained testing.

  3. Voltage Ramp-Down: Reduce voltage to zero at ≤1 kV/s, then immediately discharge the switch using grounded rods to eliminate residual charges.

Interpretation of Test Results

  • Pass Criteria: No breakdowns, flashovers, or leakage currents exceeding 5 mA during the 60-second hold. For 35 kV systems, partial discharge (PD) levels must remain <5 pC at 1.1× rated voltage.

  • Failure Modes:

    • Intermittent Discharge: Indicates suspended particles or contaminated insulators. Cleaning with isopropyl alcohol and retesting often resolves this.

    • Excessive Leakage Current: Linked to humidity ingress or internal condensation. Drying the switch at 75°C for 24 hours typically restores performance.

    • Mechanical Failure: Post-test resistance checks revealing >20% increase suggest contact burnout or loose connections, requiring component replacement.

Post-Test Documentation and Reporting

  • Data Logging: Record test voltage, duration, leakage current, and environmental conditions (temperature, humidity). Electronic archives must be retained for ≥10 years per ISO 9001.

  • Defect Tracking: For failures, specify the root cause (e.g., “C-phase insulator tracking”) and corrective actions (e.g., “replaced with epoxy-coated component”).

  • Certification: Issue reports compliant with IEC 60068-3-1, detailing test methods, equipment calibration dates, and operator qualifications.

By integrating these standards, manufacturers and technicians ensure vacuum pressure switches meet the rigorous demands of industries ranging from power grids to semiconductor fabrication, enhancing system reliability and safety.


CATEGORIES

CONTACT US

Contact: Smith

Phone: +8618603011605

E-mail: cm@chengdis.com

Whatsapp:008618603011605

Add: 1305, Building A, Phase I, Excellence Baozhong Times Square, Haitian Road, Haibin Community, Xin'an Street, Bao'an District, Shenzhen , Guangdong